The corrective action process is the set of steps a team follows to fix a problem that has already happened and to keep it from coming back. There are five: identify the problem, contain it, find the cause and take permanent action, verify that the action was implemented, and validate that it worked.
ASQ lists these elements in section IV.C of the 2022 Yellow Belt body of knowledge, at the Apply level. Expect to be handed a short story and asked which step it shows.
Correction, corrective action and preventive action
Three terms sound alike. They are not the same.
| Term | What it does | Example |
|---|---|---|
| Correction | Fixes the defect in front of you | Rework the bad part |
| Corrective action | Removes the cause of a problem that has happened, so it does not happen again | Replace the worn guide that made the bad part |
| Preventive action | Removes the cause of a problem that has not happened yet | Check the guides on the other machines before they wear out |
A correction alone leaves the cause in place, so the defect will be back. For the third row, see preventive techniques.
The five steps
1. Identify the problem
State what is wrong, where, when and how big. Use facts. Leave out causes and blame. “Bags are underweight” is weak. “12 of 200 bags in the May 3 shipment were below the 340 g label weight” is strong.
2. Contain the problem (interim action)
Protect the customer now, before you know the cause. Hold stock, sort it, add an inspection, or recall what has shipped. Containment is temporary and it costs money. It treats the symptom, not the cause. It stays in place until the permanent action is proven.
3. Find the cause and take permanent action
Dig down to the root cause with tools such as the 5 Whys or a cause and effect diagram. See root cause analysis for more. Then test the cause against the facts. Does it explain when the problem shows up and when it does not?
Next, choose a permanent action that removes the cause. The strongest actions make the error impossible. That is poka-yoke. The weakest is “tell the operator to be more careful.”
4. Verify that the action is implemented
Verification asks, “Did we do what we said we would do?” Check that the change is in place everywhere it should be. The part is installed. The work instruction is updated. The people are trained.
5. Validate that it worked
Validation asks, “Did the problem go away?” Watch the measure over time, for example on a run chart. Only then remove the containment. If the problem returns, the cause was wrong or incomplete. Go back to step 3.
Worked example: underweight coffee bags
A coffee roaster sells bags labeled 340 g.
- Identify. A customer weighs a delivery and finds 12 of 200 bags below 340 g. That is 12 / 200 = 6%.
- Contain. The roaster holds the 1,800 bags still in its warehouse and weighs every one. It finds 90 light bags, or 90 / 1,800 = 5%. The light bags are topped up, which is a correction. Until further notice, every new bag is check-weighed before it is boxed.
- Cause and permanent action. The team asks why. The filler stopped early because its scale read high. The scale read high because coffee dust had built up on it. Nobody cleaned it because cleaning was not in the work instruction, and the scale was calibrated only every 6 months. The permanent action: add a daily cleaning and a check with a test weight at the start of each shift, and calibrate every month.
- Verify. After 15 working days a supervisor audits the line. The check log is filled in for all 30 shifts (2 shifts a day). The work instruction is revised. All 8 operators have signed the training record.
- Validate. For the next 30 days the team weighs a sample of 100 bags a day. That is 3,000 bags with 0 underweight, and no new complaints. The team ends the 100% check weighing and adds the daily check to the control plan.
Notice the order. Containment came before anyone knew the cause. Verification and validation were two separate checks, made weeks apart.
Verification vs. validation
| Verification | Validation | |
|---|---|---|
| Question | Was the action implemented as planned? | Did the action fix the problem? |
| Evidence | Audit, checklist, training record, revised document | Defect data over time, complaints, a run chart |
| When | Soon after the change | After enough time to see the result |
An action can pass verification and fail validation. The new step is in use on every line and the defect still shows up. That means the team fixed the wrong cause.
How it fits with 8D and DMAIC
The 8D method is the corrective action process with more detail. It adds a team step at the front, an escape point, prevention across similar processes, and recognition at the end. In DMAIC, Analyze finds the cause, Improve puts in the permanent action, and Control validates it and holds the gain.
Many organizations log each problem as a corrective action request and track it to closure. See TRACAS for one such system.
Common mistakes
- Stopping at containment. Sorting forever is costly, and inspectors miss defects.
- Calling a correction a corrective action. Rework fixes the part, not the cause.
- Blaming a person. Ask what in the process let the error happen.
- Closing the action at verification, with no check that the problem is gone.
- Removing containment before validation.
What to expect on the exam
- Know the order: identify, contain, find the cause and take permanent action, verify, validate.
- Containment is the interim action. Sorting, holding, quarantine and extra inspection are containment.
- Verification asks if the action was implemented. Validation asks if it was effective.
- Corrective action deals with a problem that has happened. Preventive action deals with one that could.
- “Retrain the operator” is seldom the best permanent action when a design or process change is on the list.
When you’re ready, there are a few ways I can help:
First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.
* * *
If you’re looking to pass your Six Sigma Yellow Belt, Green Belt or Black Belt exam, I’d recommend starting with my affordable study guide:
1)→ 🟡Pass Your Six Sigma Yellow Belt: built for ASQ, IASSC and ILSSI, 1,700+ practice questions with explanations, and six full-length mock exams for your exam
2)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,300+ practice questions with detailed answer explanations, and 20 full-length mock exams
3)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,200+ practice questions with detailed answer explanations, and 20 full-length mock exams
You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,700+ exam-like questions for Yellow Belts, 1,300+ for Green Belts and 2,200+ for Black Belts with full answer walkthroughs, access to instructors, detailed study material, and more.
Thousands have used this system to prepare. Join them here.