A bottleneck is the step in a process with the least capacity. It limits how much the whole process can produce, no matter how fast the other steps run. Work piles up in front of it and the steps after it wait. To get more out of the process, you have to improve the bottleneck. Improving any other step changes nothing.

ILSSI lists “Flow and Bottle-necks” in its Yellow Belt body of knowledge, next to single-piece flow, pull and kanban. The name comes from a bottle. However wide the body is, the liquid pours only as fast as the neck allows.

What flow means

Flow is one of the five Lean principles. Work flows when it moves from step to step without stopping, waiting or going back. The ideal is single-piece flow, where each unit moves to the next step as soon as it is done.

A bottleneck is what breaks flow. Work arrives faster than the step can handle it, so a queue forms. A queue is waiting and inventory, two of the classic wastes.

How to spot a bottleneck

  • Work piles up in front of it. Look for the longest queue.
  • The steps after it run out of work and sit idle.
  • It is always busy. It runs overtime while other steps have slack.
  • Its cycle time is longer than the takt time, the pace that customer demand calls for.
  • People chase and expedite the work that is stuck there.

A process map or a value stream map with the cycle time and the inventory at each step will show it. So will a walk through the process. Look for the pile.

Worked example: an order fulfillment line

A warehouse fills orders in four steps, one after the other.

StepCapacity (orders per hour)
Order entry40
Picking25
Packing35
Shipping50

Picking is the bottleneck. It has the lowest capacity, so the whole line can ship at most 25 orders per hour.

Demand is 30 orders per hour. Each hour, 30 – 25 = 5 more orders arrive at picking than leave it. Over an 8 hour shift, that is 5 x 8 = 40 orders waiting.

Takt time shows the same thing. To meet demand, the line must finish an order every 3,600 / 30 = 120 seconds. Picking needs 3,600 / 25 = 144 seconds per order. It cannot keep up.

Improving the wrong step

The manager buys a faster tape machine. Packing goes from 35 to 45 orders per hour. The line still ships 25. Packing was already waiting on picking. The money is spent and nothing is gained.

Improving the bottleneck

The team moves the best-selling items closer to the pickers. Picking goes from 25 to 32 orders per hour. Now the lowest capacity on the line is 32, which is above the demand of 30. The queue stops growing.

The bottleneck moves

Suppose picking later reaches 38 orders per hour. Now packing, at 35, is the lowest step. The bottleneck has moved. There is always one. That is why improving flow is a cycle and not a one-time fix.

How to improve flow at a bottleneck

Start with the cheap fixes. The theory of constraints calls this exploiting the constraint before you spend money on it.

  1. Keep it running. Do not let it wait for material, instructions or people. Cover breaks and shift changes.
  2. Do not feed it defects. Inspect before the bottleneck, so it never spends time on work that will be scrapped.
  3. Cut its setup time. See quick changeovers (SMED).
  4. Move work off it. Give other steps any task they can do just as well.
  5. Pace the other steps to it. Making more upstream only builds inventory. A pull system with kanban signals does this.
  6. Add capacity last: another person, machine or shift.

An hour lost at the bottleneck is an hour lost for the whole process. An hour saved at any other step saves nothing.

Bottlenecks in office and service work

Bottlenecks are not only machines. In an office, the bottleneck is often an approval. Ten people prepare quotes and one manager signs them on Fridays. In a clinic, it may be the one exam room with the right equipment. In software, it may be the single tester who checks every change.

The signs are the same. Look for the full inbox, the long waiting list, and the people downstream who keep asking, “Is it ready yet?” The fixes are the same too. Keep the bottleneck working on the right things, take other tasks off its plate, and make sure the work that reaches it is complete and correct.

Bottleneck and constraint

The two words are often used as if they meant the same thing. A bottleneck is a step that cannot keep up with the demand placed on it. A constraint is anything that limits what the system can achieve. It can be a machine, but it can also be a policy, a supplier or the market itself. At Yellow Belt level, treat the bottleneck as the slowest step in the process.

What to expect on the exam

  • Know the definition. The bottleneck is the step with the lowest capacity, and it sets the output of the whole process.
  • For steps in a row, the output of the process equals the lowest step capacity.
  • Speeding up a step that is not the bottleneck does not raise output. Upstream of the bottleneck, it only adds inventory.
  • Signs of a bottleneck: a queue in front of it and idle steps after it.
  • The first move is to make sure the bottleneck never sits idle.
  • After you fix one bottleneck, look for the next one.

When you’re ready, there are a few ways I can help:

First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.

* * *

If you’re looking to pass your Six Sigma Yellow Belt, Green Belt or Black Belt exam, I’d recommend starting with my affordable study guide:

1)→ 🟡Pass Your Six Sigma Yellow Belt: built for ASQ, IASSC and ILSSI, 1,700+ practice questions with explanations, and six full-length mock exams for your exam

2)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,300+ practice questions with detailed answer explanations, and 20 full-length mock exams

3)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,200+ practice questions with detailed answer explanations, and 20 full-length mock exams

You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,700+ exam-like questions for Yellow Belts, 1,300+ for Green Belts and 2,200+ for Black Belts with full answer walkthroughs, access to instructors, detailed study material, and more.

​ Thousands have used this system to prepare. Join them here. 

Author

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.