Value-added vs non-value-added activities: the three tests for value, the required-waste category, process cycle efficiency, and a worked example.
Single piece flow explained: why moving one item at a time beats batches on lead time, what it requires, and a worked batch vs. flow example.
Overall equipment effectiveness explained: availability x performance x quality, the six big losses, and a step-by-step OEE calculation.
Heijunka production leveling explained: level volume and mix, build a mixed-model sequence, size a heijunka box, with a worked example.
The five lean principles explained: value, value stream, flow, pull and perfection, with a worked hospital example and Green Belt exam tips.
