Standard control chart advice says you need 20 to 25 subgroups before the limits mean much. That’s fine on a line that makes the same part all week. It’s useless in a job shop that runs 40 pieces of a part number and then switches. By the time you have enough data, the job is done. Short-run SPC charts solve that problem by charting the process instead of the part. ASQ and Villanova both place short-run SPC under advanced statistical process control at Black Belt, alongside tools like EWMA and CUSUM.

Short-run SPC charts: a deviation from nominal individuals chart with three part sizes on one chart

Why ordinary charts struggle with short runs

A normal X-bar and R chart, or an individuals chart, plots one characteristic of one part number. The limits come from that part’s data.

Short runs break this in three ways:

  • Not enough data. A run of 30 parts might give you a handful of subgroups.
  • Many part numbers. Each would need its own chart, most with only a few points.
  • Different targets. Part A is 12 mm, part B is 18 mm. Plot them on one chart and the “shifts” are just part changes.

But the machine, the operator and the method are often the same across part numbers. The process is continuous even when the parts aren’t. Short-run methods take advantage of that.

The core idea behind short-run SPC charts

Transform each measurement so that different parts land on a common scale. Then put them all on one chart, in time order.

There are two main transformations.

Deviation from nominal (DNOM)

Subtract the target (nominal) value from each reading.

Deviation = measurement − nominal

A 12.02 mm reading on a 12.00 mm part becomes +0.02. An 18.01 mm reading on an 18.00 mm part becomes +0.01. Now they’re comparable.

Plot the deviations on an individuals and moving range chart, or an X-bar and R chart if you take subgroups. Calculate limits from the deviations in the usual way.

Key assumption: the variation is about the same for all part numbers. If one part varies far more than the others, it will dominate the chart.

Golf uses the same trick. A score of 74 means something different on a par-70 course than on a par-72 course. So players talk about score relative to par: +4 and +2. Relative to par, rounds on different courses can sit on one chart.

Standardized (Z) charts

When part numbers have different amounts of variation, deviation from nominal isn’t enough. Divide by each part’s standard deviation too.

Z = (measurement − target) / σ for that part

Every point is now in standard deviation units. The center line is 0 and the control limits are ±3. Any part, any size, any variation.

You need a good estimate of σ for each part number. That can come from history, from similar parts, or from the range of the first few runs.

Pediatric growth charts follow the same logic. A doctor can’t compare a 4-year-old’s height to a 10-year-old’s directly. So they compare each child to the typical spread for their age. A standardized score makes them comparable.

Worked example: a DNOM chart in a machine shop

Say a CNC lathe turns bushings in three sizes: 12.00, 18.00 and 25.00 mm (illustrative numbers). A real chart would need many more points before you’d trust the limits. Past capability studies show the standard deviation is about the same for all three. The shop measures one part from each run, in time order.

OrderPart nominal (mm)Measured (mm)Deviation (mm)
112.0012.01+0.01
212.0011.99−0.01
312.0012.02+0.02
418.0018.02+0.02
518.0018.000.00
625.0024.98−0.02
725.0025.01+0.01
825.0025.03+0.03

Step 1: average deviation. Sum = 0.06. Average = 0.06 / 8 = 0.0075 mm.

Step 2: moving ranges. The absolute differences between consecutive deviations are 0.02, 0.03, 0.00, 0.02, 0.02, 0.03, 0.02. Average moving range = 0.14 / 7 = 0.02 mm.

Step 3: control limits for the individuals chart. Use 2.66 × average moving range.

  • UCL = 0.0075 + 2.66 × 0.02 = 0.0075 + 0.053 ≈ +0.061 mm
  • LCL = 0.0075 − 0.053 ≈ −0.046 mm

All eight points sit inside the limits. The center line is slightly positive, which hints that the lathe may run a touch large across all part sizes. With more data, a run of points above zero would confirm a bias worth correcting with a tool offset.

You only see that because all three sizes share a chart. Separate charts would each have two or three points and would show nothing.

Hospital lab turnaround on one standardized chart

Take a hospital lab that runs three test types with different targets and different variation:

  • Basic panel: target 45 minutes, σ = 8 minutes
  • Coagulation: target 60 minutes, σ = 12 minutes
  • Culture setup: target 90 minutes, σ = 20 minutes

The lab manager wants one chart for the shift. A basic panel taking 61 minutes gives Z = (61 − 45) / 8 = 2.0. A culture setup taking 120 minutes gives Z = (120 − 90) / 20 = 1.5. On a standardized chart with limits at ±3, the manager can watch all three test types together. A run of positive Z values across test types points to a shift-wide cause, like staffing, rather than a problem with one analyzer.

Other advanced SPC tools to know

Short-run charts are one part of advanced SPC. The BOKs also expect you to recognize these.

  • EWMA (exponentially weighted moving average) charts weight recent data more heavily. They’re good at catching small, gradual shifts. See our EWMA chart guide.
  • CUSUM (cumulative sum) charts add up deviations from target over time. Small persistent shifts build into a clear signal. See our CUSUM chart guide.
  • Moving average charts smooth individual readings to reduce noise.

A simple way to choose:

SituationTool to consider
Many part numbers, same variationDNOM chart
Many part numbers, different variationStandardized (Z) chart
Need to catch small, slow driftsEWMA or CUSUM
Plenty of data, one part, normal shiftsStandard Shewhart chart

Practical cautions

  • Group by process, not by part. Only combine parts that run on the same machine with the same setup method.
  • Check the variation assumption. Before using DNOM, compare the standard deviations of the part numbers. If they differ a lot, switch to a Z chart.
  • Use the right target. For two-sided specs, nominal is usually the midpoint. If the process can’t hit nominal for a good reason, use the historical average for that part instead, and document it.
  • Mark part changes on the chart. A note or a symbol for each part number makes patterns easier to spot.
  • Apply the usual rules. Once the chart is built, read it with standard control chart rules.

On the exam: short-run SPC charts

Black Belt questions tend to test when to use a tool more than the arithmetic. Expect:

  • When short-run methods apply. Small lots, many part numbers, not enough data for separate charts.
  • DNOM formula. Plot measurement minus nominal. Assumes similar variation across parts.
  • Standardized chart formula. (Measurement − target) / σ. Center line 0, limits ±3.
  • Matching tools to situations. EWMA and CUSUM for small shifts. Short-run charts for mixed parts.
  • Why not separate charts? Too few points per part to set useful limits.

A common distractor suggests waiting until each part number has 25 subgroups. In a short-run shop, that may never happen.

When you’re ready, there are a few ways I can help:

First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.

* * *

If you’re looking to pass your Six Sigma Yellow Belt, Green Belt or Black Belt exam, I’d recommend starting with my affordable study guide:

1)→ 🟡Pass Your Six Sigma Yellow Belt: built for ASQ, IASSC and ILSSI, 1,700+ practice questions with explanations, and six full-length mock exams for your exam

2)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,300+ practice questions with detailed answer explanations, and 20 full-length mock exams

3)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,200+ practice questions with detailed answer explanations, and 20 full-length mock exams

You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,700+ exam-like questions for Yellow Belts, 1,300+ for Green Belts and 2,200+ for Black Belts with full answer walkthroughs, access to instructors, detailed study material, and more.

​ Thousands have used this system to prepare. Join them here. 

Author

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.