Every measurement system has two kinds of error. One is about spread. The other is about location. Gage R&R covers the spread. Bias, linearity and stability cover the location: is the gauge reading the true value, across the whole range, and does it keep doing so over time?

It’s a common gap in Green Belt projects. The team runs a Gage R&R, gets a nice 8% result, and moves on. Then the gauge turns out to read high by a fixed amount. The R&R study can’t see that. Every operator reads the same wrong number, very consistently.
Accuracy and precision: where bias, linearity and stability fit
The published BOKs split measurement error into two families.
- Accuracy (location): how close the average reading is to the true value. Bias, linearity and stability live here.
- Precision (width): how much readings scatter around their own average. Repeatability and reproducibility live here.
A dartboard makes this stick. Tight cluster in the wrong corner? Precise, not accurate. That’s a bias problem. Darts all over the board but centered on the bullseye? Accurate on average, not precise. That’s an R&R problem.
You need both. A gauge can pass one test and fail the other.
What is bias?
Bias is the difference between the average of repeated measurements and a reference value.
Bias = observed average − reference value
The reference value comes from something you trust more than the gauge under study. Usually that’s a master part measured in a calibration lab, or a gauge block with a certified size.
A positive bias means the gauge reads high. A negative bias means it reads low.
Think of a baseball radar gun that always shows 2 mph faster than the pitch. Every pitcher on the team looks better than they are. The readings are consistent, and consistently wrong.
Worked example: bias on a machined shaft
Say a machine shop checks shaft diameters with a digital caliper (illustrative numbers, not real plant data). The calibration lab certifies a master shaft at 25.000 mm. One operator measures the master 10 times:
25.01, 25.02, 25.01, 25.00, 25.02, 25.01, 25.02, 25.01, 25.01, 25.01
The average is 25.012 mm.
Bias = 25.012 − 25.000 = +0.012 mm
Is that a lot? It depends on what you compare it to. Two common comparisons:
- Percent of tolerance. The spec is 25.00 ± 0.10 mm, so the tolerance is 0.20 mm. 0.012 / 0.20 = 6%.
- Percent of process variation. If the process spread (6 standard deviations) is 0.15 mm, then 0.012 / 0.15 = 8%.
Software such as Minitab also runs a one-sample t-test on the readings against the reference. If the p-value is small, the bias is statistically significant. Then you decide whether it matters in practice. A significant but tiny bias is often fine. Your calibration procedure decides how much is too much.
What do you do about it? Recalibrate, adjust the zero, or apply a correction. Then measure the master again to confirm.
What is linearity?
Linearity asks a follow-up question. Is the bias the same across the whole operating range of the gauge?
A bathroom scale might be spot on at 50 kg and read 2 kg light at 120 kg. Its bias changes with the size of the thing being measured. That change is a linearity problem.
To study linearity you need several reference parts that span the range you use. Five is common. You measure each one many times, calculate the bias at each reference value, and fit a straight line through the bias values.
- The slope of that line tells you how fast bias changes as size changes.
- A slope near zero means good linearity. Bias is constant (even if it isn’t zero).
Worked example: linearity on a depth gauge
A depth gauge is used on parts from 2 mm to 10 mm deep. The team picks five master parts and measures each 12 times.
| Reference (mm) | Average bias (mm) |
|---|---|
| 2 | +0.02 |
| 4 | +0.01 |
| 6 | 0.00 |
| 8 | −0.01 |
| 10 | −0.03 |
Fit a line of bias against reference. The slope works out to −0.006. The intercept is +0.034.
So bias ≈ 0.034 − 0.006 × (reference).
The gauge reads high on shallow parts and low on deep parts. At 6 mm it happens to read true. If you had only checked bias at 6 mm, you’d have called this gauge perfect.
The AIAG MSA method reports:
- Linearity = |slope| × process variation. With a process variation of 6.0 mm, linearity = 0.006 × 6.0 = 0.036 mm.
- % Linearity = |slope| × 100 = 0.6%.
Check the scatter around the line too. If the bias points wander and don’t follow any straight line, the problem isn’t linearity. The gauge has some other issue, and you should look at it before trusting any of this.
Common causes of poor linearity: a worn gauge at one end of its travel, a gauge built for a narrower range, or calibration done at only one point.
What is stability?
Stability is bias over time. Drift is the everyday word for it.
A gauge can be accurate on Monday and off by Friday. Temperature, wear, dirt, a dropped instrument, a battery going flat. Stability tells you whether the measurement system stays put.
The usual method is a control chart. Pick a master part. Measure it a few times on a regular schedule (every shift, every day). Plot the results on an X-bar and R chart, or an individuals chart if you take one reading each time.
- If the chart stays in control, the system is stable.
- A trend or a shift on the X-bar chart means the bias is moving.
- Out-of-control points on the R chart mean the precision is changing.
This is where the control chart rules you learned for processes apply to the gauge itself.
Worked example: stability in a service setting
Measurement systems aren’t only calipers. A call center scores call quality with a checklist. The quality team keeps a recorded “reference call” with an agreed score of 82.
Every Monday, each reviewer scores the reference call. The team plots the weekly average on an individuals chart. For two months it hovers around 81 to 83. Then it climbs to 86, 87, 88 over three weeks.
Nothing changed in the call. The reviewers changed. A new manager had started praising high scores, and reviewers drifted generous. That’s a stability problem in a human measurement system. The fix was recalibration: a scoring session on the reference call and a clearer rubric.
How bias, linearity and stability relate to Gage R&R
Run these studies before or alongside a Gage R&R. The order matters in practice:
- Stability first. If the gauge drifts, everything else is a snapshot of a moving target.
- Bias and linearity next. Fix location errors with calibration or correction.
- Gage R&R last. Check that the spread is small enough relative to tolerance or process variation.
The full picture is in our measurement systems analysis guide. For attribute data (pass/fail, ratings), use attribute agreement analysis instead.
One more point that trips people up. Calibration and MSA aren’t the same thing. Calibration compares one gauge to a standard at set points. MSA looks at the whole system: gauge, people, method, environment, across the range and over time. A calibrated gauge can still fail a linearity study if it was calibrated at only one point.
On the exam: bias, linearity and stability questions
Expect these at Yellow, Green and Black Belt, with depth rising by belt.
- Definitions. Know which word goes with which description. Bias: average versus reference. Linearity: bias across the operating range. Stability: bias over time.
- Accuracy vs. precision. Bias, linearity and stability are accuracy. Repeatability and reproducibility are precision. This pairing is a favorite.
- Simple bias math. Given a reference value and a list of readings, calculate the bias and say whether the gauge reads high or low.
- Linearity from a slope. Given a slope and a process variation, calculate linearity or % linearity.
- Which tool for stability? A control chart on a master part over time.
- Green and Black Belt: interpret a linearity plot, and say what to do when bias is significant (calibrate, adjust, or apply a correction).
Watch the sign. “Observed minus reference” is the convention. A question that reverses it is testing whether you notice.
When you’re ready, there are a few ways I can help:
First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.
* * *
If you’re looking to pass your Six Sigma Yellow Belt, Green Belt or Black Belt exam, I’d recommend starting with my affordable study guide:
1)→ 🟡Pass Your Six Sigma Yellow Belt: built for ASQ, IASSC and ILSSI, 1,700+ practice questions with explanations, and six full-length mock exams for your exam
2)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,300+ practice questions with detailed answer explanations, and 20 full-length mock exams
3)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,200+ practice questions with detailed answer explanations, and 20 full-length mock exams
You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,700+ exam-like questions for Yellow Belts, 1,300+ for Green Belts and 2,200+ for Black Belts with full answer walkthroughs, access to instructors, detailed study material, and more.
Thousands have used this system to prepare. Join them here.