Line of sight is an unbroken link from the measures a team works on every day up to the organization’s strategy. When it exists, anyone can explain how moving their own measure moves the next measure up, and so on to a strategic goal. You create it by cascading each strategic objective into measures at every level, then checking the chain from the top down and from the bottom up.

ASQ’s 2022 Black Belt body of knowledge, section II.C.1, asks you to explain how to create a line of sight from performance measures to organizational strategies. For a Black Belt, the practical point is this: the project’s main metric should sit on that line.

Why line of sight matters

  • People work on the right things. A team that can see the link knows which problems are worth its time.
  • Leaders can check the plan early. If the measures under an objective do not add up to it, the objective will be missed.
  • Projects are easier to defend. A project that sits on the line has a business reason anyone can read.

What the chain looks like

Take a regional bank whose strategy is to win small-business customers with fast lending decisions.

LevelWhat is set thereBank example
StrategyWhere and how to winWin small-business customers with fast lending decisions
Strategic objectiveA measurable aim with a dateCut average loan decision time from 9 days to 4 days this year
Business KPIThe result measure leaders watchAverage decision time, in days
Department measuresThe drivers each function ownsDocument rework time, underwriting time, sign-off time
Project metricWhat one project movesShare of applications complete on first submission
Daily measuresWhat people see and do each dayCount of incomplete applications today; intake checklist used

Each level is a leading indicator for the level above it. The top of the chain is made of lagging results. The bottom is made of drivers and behaviors. See KPIs, KBIs and OKRs for those terms.

How to create a line of sight

  1. Start from the strategy, not from the measures you already have.
  2. Give each strategic objective one or two result measures, each with a target and a date.
  3. At each level ask “what drives this?” A tree diagram is a simple way to draw the answers.
  4. Give every measure one owner.
  5. Test the chain from the bottom up. For any measure, ask “why does this matter?” If the answers do not reach a strategic objective in a few steps, the measure is an orphan.
  6. Test it from the top down. For any objective, ask “how?” If no measure or project sits under it, the objective has a gap.
  7. Review the chain at every level, using the same measures in each review.

Several tools do this work:

  • Hoshin Kanri cascades objectives level by level. Catchball lets each level push back on targets it cannot meet.
  • A balanced scorecard groups measures into four views and links them to strategy.
  • OKRs tie measurable key results to each objective.
  • A CTQ tree does the same job inside a project, from a customer need down to a measurable requirement.

Worked example: do the projects reach the target?

The bank’s average decision time is 9.0 days. A process map shows four stages. Their average times add up to the total.

StageNow (days)Project target (days)Gain (days)
Intake1.01.00.0
Document rework4.01.03.0
Underwriting3.01.51.5
Sign-off1.00.50.5
Total9.04.05.0

Three projects are chartered. Their targets add up to 9.0 − 5.0 = 4.0 days, which is the strategic objective. The line of sight is complete, and it has numbers on it.

Now suppose the document rework project is only chartered to reach 2.0 days. The total becomes 5.0 days. The bank would miss its objective by a full day, and leaders can see that before the year starts, not after it ends.

The rework project’s own metric is the share of applications that are complete on first submission. It is 62% today and the target is 90%. Branch staff see a daily count of incomplete applications. A loan officer can now say: complete applications mean less rework, less rework means faster decisions, and faster decisions win small-business customers.

A fourth proposal is on the list: redesign the branch newsletter. Nobody can connect it to any objective. With a clear line of sight, it is easy to see that it should wait. That is the link to project selection.

Signs the line of sight is broken

  • Teams hit their targets but the business result does not move.
  • People track measures that nobody can explain.
  • Projects are picked by whoever argues loudest.
  • Local targets fight each other. Purchasing is rewarded for a low price while the plant pays for the defects.
  • Leaders watch only lagging financial results, with no drivers underneath.

Write the link into every project charter: which strategic objective the project supports and by how much. A target written as a SMART goal makes that easy to check.

What to expect on the exam

This is an Analyze level topic. Expect a question that gives a strategy and asks which set of measures connects the shop floor to it. The right set has a driver at each level that leads to the strategic result. Other questions ask which project best supports a stated strategy, or which tool cascades objectives through the organization. Know the difference between leading and lagging indicators, since a good chain has both.

When you’re ready, there are a few ways I can help:

First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.

* * *

If you’re looking to pass your Six Sigma Yellow Belt, Green Belt or Black Belt exam, I’d recommend starting with my affordable study guide:

1)→ 🟡Pass Your Six Sigma Yellow Belt: built for ASQ, IASSC and ILSSI, 1,700+ practice questions with explanations, and six full-length mock exams for your exam

2)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,300+ practice questions with detailed answer explanations, and 20 full-length mock exams

3)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,200+ practice questions with detailed answer explanations, and 20 full-length mock exams

You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,700+ exam-like questions for Yellow Belts, 1,300+ for Green Belts and 2,200+ for Black Belts with full answer walkthroughs, access to instructors, detailed study material, and more.

​ Thousands have used this system to prepare. Join them here. 

Author

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.