Search

Do the Work, Pass Your Exam, or Your $ Back.

100% of candidates who complete my study guide report passing their exam! Full refund if you complete the study guide but fail your exam. This is your 100% Risk Free option!

Skip to content
Six Sigma Study Guide
Six Sigma Study Guide Study notes and guides for Six Sigma certification tests
  • Log In
  • Register
  • About
  • Six Sigma Articles
  • Newsletter
  • Pass Your Six Sigma Black Belt
  • Pass Your Six Sigma Green Belt
Home  /  Six Sigma Study Guide Articles  /  Month: June 2014

Month: June 2014

Ted Hessing

Six Sigma Belts

Posted by Ted Hessing

Six Sigma Belts loosely parallel American martial arts schools: Lighter belts are novices, black belts are experts.

This entry was posted in Six Sigma Deployment and tagged . Bookmark the permalink.
Ted Hessing

Gage Repeatability and Reproducibility (R&R)

Posted by Ted Hessing

Gage Repeatability and Reproducibility is commonly referred to as Gage R&R. It’s a method is to look at variability in our measurements.

This entry was posted in Measure, Measurement Systems Analysis and tagged ASQ, Black Belt, Download, Green Belt, IASSC, Villanova, Yellow Belt. Bookmark the permalink.
Ted Hessing

EWMA – Exponentially Weighted Moving Average Chart

Posted by Ted Hessing

The EWMA – Exponentially Weighted Moving Average chart is used to monitor variables that make use of the entire history of a given output.

This entry was posted in Control, Other Control Charts and tagged Black Belt, Green Belt, IASSC, QuestionSet, Villanova. Bookmark the permalink.
Ted Hessing

Cumulative Sum Chart (CUSUM)

Posted by Ted Hessing

Cumulative Sum Chart (CUSUM) is a type of control chart used to detect the deviation of the values or subgroup mean from the target value.

This entry was posted in Control, Descriptive Statistics, Measure, Other Control Charts and tagged ASQ, Black Belt, Green Belt, IASSC, Villanova. Bookmark the permalink.
Ted Hessing

I-MR Chart

Posted by Ted Hessing

An Individual moving range chart (I-MR Chart) also called X-MR is used when data is continuous and not collected in subgroups (n=1).

This entry was posted in Basic Control Charts, Control and tagged ASQ, Black Belt, Green Belt, IASSC. Bookmark the permalink.
Posts navigation
← Older posts
Newer posts →

Ready to Pass Your Six Sigma Exam?

Do the Work, Pass Your Exam, or Your $ Back.

100% of candidates who complete my study guide report passing their exam! Full refund if you complete the study guide but fail your exam. This is your 100% Risk Free option!

Search

Recent Newsletters

  • The Six Fix #020: Six Sigma Choices: Did You Pick the Right Organization?
  • The Six Fix #019: Case Study: New Year’s Gym Rush Management
  • The Six Fix #018: Six Sigma Case Study: Economic Development Education Program
  • The Six Fix #017: How to Gain Trust
  • The Six Fix #016: Abandoned Carts? This E-commerce Store Solved It (Using Six Sigma!)

Articles

  • Six Sigma Basics
  • Lean
  • Define
  • Measure
  • Analyze
  • Improve
  • Control
  • Certification FAQs
  • Newsletter
  • 6 Sigma in Real Life
Back to Top