DPMO is defects per million opportunities: DPMO = defects / (units x opportunities per unit) x 1,000,000. The sigma level is the long-term Z value for that defect rate plus the 1.5 sigma shift, so 3.4 DPMO is 6 sigma. Enter your defects, units and opportunities below. The calculator gives DPU, DPO, DPMO, yield and the sigma level, and you can switch the 1.5 shift off to see the plain Z. Free, no sign-up, nothing leaves your browser.
When to use it
Use it in the Measure phase to set a baseline for a process you count rather than measure: invoices with errors, calls handled wrong, units with cosmetic flaws. Use it again after the improvement to show the change on the same scale. DPMO lets you compare processes with different complexity, because it divides by the number of chances to fail.
The formulas
- Total opportunities = units x opportunities per unit
- DPU (defects per unit) = defects / units
- DPO (defects per opportunity) = defects / total opportunities
- DPMO = DPO x 1,000,000
- Yield = 1 minus DPO
- Throughput yield estimate = e^(minus DPU) (the Poisson approximation for the share of units with zero defects)
- Long-term Z = the standard normal value whose upper tail equals DPO
- Sigma level (short-term, the Six Sigma convention) = long-term Z + 1.5
Reverse direction: DPMO = 1,000,000 x P(Z > sigma level minus 1.5). Untick the shift box and the 1.5 drops out of both directions.
Worked example
A call center handles 1,000 calls in a day. Each call has 4 ways to go wrong: wrong greeting, wrong hold time, wrong answer, wrong wrap-up code. The team logs 200 defects.
- Total opportunities = 1,000 x 4 = 4,000
- DPU = 200 / 1,000 = 0.20
- DPO = 200 / 4,000 = 0.05
- DPMO = 0.05 x 1,000,000 = 50,000
- Yield = 1 minus 0.05 = 95%
- Long-term Z = 1.64 (the upper tail of the standard normal at 0.05)
- Sigma level with the 1.5 shift = 1.64 + 1.5 = 3.14
So this is a 3.1 sigma process by the usual convention, and a 1.6 sigma process if you refuse the shift. Both numbers describe the same 50,000 DPMO. The convention is the only thing that changed.
Where the 1.5 comes from
Motorola’s engineers added 1.5 sigma to the long-term Z in the 1980s to allow for the drift they saw in process means over time. That is why “six sigma” is quoted as 3.4 DPMO: the tail beyond 4.5 sigma (6 minus 1.5) is 3.4 per million. Without the shift, six sigma would be 0.001 DPMO. Every sigma table you meet in a Six Sigma course uses the shifted version, so the calculator defaults to it and says so. The calculator assumptions and formulas page covers the convention and the argument against the shift.
Sigma level reference points (with the 1.5 shift)
| Sigma level | DPMO | Yield |
|---|---|---|
| 2 | 308,538 | 69.1% |
| 3 | 66,807 | 93.3% |
| 4 | 6,210 | 99.38% |
| 5 | 233 | 99.977% |
| 6 | 3.4 | 99.99966% |
Go deeper
- Process Performance Metrics: DPU, DPO, DPMO, RTY walks through each metric with the Joe’s Burgers example.
- Z Scores and Process Sigma covers the Z-to-sigma step and the baseline sigma calculation.
- Control Chart Constants if you came here from a control chart.
Studying for an exam? DPMO, DPU and yield are on the Green Belt and Black Belt bodies of knowledge. The practice questions are in the study guide courses.