The Six Fix #008: Process Improvement in a Furniture Factory ??

Imagine you’re the general manager of a furniture manufacturer.

You’re facing excessive production lead time in the factory.

I’m sure you can guess the kinds of headaches this has led to delayed deliveries, unhappy customers, and upset management.

Your company is getting roasted on social media by your consumer base.

What are you going to do?

Before we dive into the team’s solution, let’s entertain a few alternative paths they could have taken.

Alternative Options

1. Increasing manpower

One could always throw more people at the problem, but this would escalate labor costs, and there’s no guarantee that it would lead to a proportional decrease in lead time.

2. Investing in automation

Implementing cutting-edge technology could speed up production, but it’s a costly choice that requires significant investment and may not always fit the specific needs of a factory’s processes.

3. Scaling back production

By producing fewer products, the factory could free up resources to focus on reducing lead time. But, this approach would likely result in decreased revenue and may not address the root cause of the problem.

But Why DMEDI?

The team adopted the DMEDI (Define, Measure, Explore, Develop, Implement) framework instead of the DMAIC framework. DMEDI was chosen because it focuses on creating a new, more efficient process rather than improving the existing one. Let’s dive into the 5 DMEDI phases to understand the steps taken to address the issue:

Define: The team began by defining the problem and determining the project scope. They utilized tools such as the voice of the customer (VOC) to understand customer needs and expectations and established key performance indicators (KPIs) to measure success.

Measure: Next, the team gathered and analyzed data to understand the factors contributing to the increased lead time. They employed tools like SIPOC (Suppliers, Inputs, Process, Outputs, and Customers) to gain a high-level view of the process, Pareto charts to identify the most significant issues, and process maps to visualize the current state of operations.

Explore: In this phase, the team explored potential solutions to reduce lead time. They employed root cause analysis techniques, such as the 5 Whys, to identify underlying problems and brainstormed innovative approaches that could result in a more efficient process.

Develop: Based on their findings, the team developed a new process design. They considered various process alternatives and selected the most promising one. The team then used tools like control charts to ensure the new process would deliver the desired results while maintaining quality and cost-effectiveness.

Implement: The team implemented the new process and monitored its performance. They made adjustments as needed to ensure the new process was both effective and sustainable. The team also established a system of controls to maintain the improvements achieved in the lead time reduction.

Conclusion

This case study highlights the value of Six Sigma methodologies and the DMEDI framework in addressing complex process improvement challenges. By following the DMEDI phases and using the appropriate tools, the team in this furniture factory reduced their production lead time, resulting in more satisfied customers and better efficiency.

May this inspiring example encourage you to apply the principles of Six Sigma in your own work and strive for improvement.

If you want to see the full case study on Six Sigma D-MEDI, click here to read the full article.

I hope you find this case study as fascinating and inspiring as I did. If you have any questions or comments, feel free to contact me. I’m always happy to chat.

Best regards, Ted Hessing

When you’re ready, there are a few ways I can help:

First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.

* * *

If you’re looking to pass your Six Sigma Green Belt or Black Belt exams, I’d recommend starting with my affordable study guide:

1)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

2)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,000+ exam-like questions for Green Belts (2,000+ for Black Belts) with full answer walkthroughs, access to instructors, detailed study material, and more.

​ Thousands have used this system to prepare. Join them here. 

How to Define a Process

In Six Sigma DMAIC, determining how to define a process is one of the critical aspects of the approach, as it is the basis for identifying sub-processes and, eventually, the improvement project or problem-solving projects.

Defining the process assumes that you have already created the project charter, set up the project scope, and now identify some ways to visualize a process.

The level of detail required to define the process depends on both the improvement opportunities and the complexities of the problem. Based on complexity, processes can be viewed as both micro or sub-processes and constituents of more extensive macro processes.

What is a Process

A process is an organized group of related activities that combine to transform one or more kinds of input into outputs that are of value to the customers. In other words, a process is an activity or group of activities that takes the inputs, adds value, and provides outputs to internal or external customers.

The process is a set of activities that interact with one another. Often, the output of one process is the input of another process. The activities which are in relation to a process of importance should be documented and controlled.

Six Sigma can be used to address problems within the manufacturing process or within any business process.

Why define a process

  • You have a project started, or you want to start a project
  • To understand the project scope clearly
  • Finding the pain areas in the process
  • You’re handling VOC or Kano addressing some defect or improving a dashboard, KPI, or other measures.
  • To understand the process from the perspective of the customer.

How to define a process

  • Get the general overall picture of the process and observe the process in action.
    • Understand the Voice of the customer and think about y=f(x), where x is the input, f is the function, and y is the output of the process.
    • Determine CTQs and list all the steps
    • Understand the process interdependencies
    • perhaps use the basic root cause analysis with Ishikawa fishbone or a similar analytic tool
  • Interview associates and other stakeholders involved in the process
  • Start with outcomes like deliverables and trace backward, making a SIPOC
    • Be sure to state where you are beginning and ending clearly. It’s easy to have scope creep.
  • Use Process definition tools.
    • SIPOC, Process map, Value Stream Map
  • Review operating procedures or manuals.
  • Finally, all the team members must have an overall understanding of the process.

Don’t forget to do a final confidence check that you mapped the right process! It’s easy to go overboard.

Tools for Defining a Process

SIPOC

SIPOC is a high-level process mapping tool to help visualize a process and its influences. In other words, it is a useful tool that depicts how a process serves the customer and summarizes the inputs and outputs of a process in a visual format. 

The acronym for SIPOC stands for Supplier, Input, Process, Output, and Customer.

Elements of SIPOC

  • Supplier to the process
  • Inputs (X’s) for the process
  • Process steps
  • Process outputs- what the process produces
  • Customers-  Who receives the product or services
How to Define a Process

Process Mapping

Process mapping is the graphical representation with illustrative descriptions of how things get done. It helps the participants visualize the process details closely and guides decision-making. One can identify the major areas of strengths and weaknesses in the existing process.

The major components of a process map include the inputs, outputs, and steps in the process. A good process map should illustrate the workflow and the organization’s interaction. It should use a common language (symbols) that everyone easily understands.

How to Define a Process

An ideal process map should contain proper detail regarding multiple paths, decisions, and rework loops.

How to Define a Process

Types of process maps

There are two major types of process maps: Process flowcharts and Deployment flowcharts.

Process Flowchart:

A process flowchart is a simple process map that visually represents the sequence of activities along with their points of decision. These flowcharts provide the basic details of the process, which can later be augmented by adding different staff roles.

Deployment Flowchart:

These process maps provide the interactions between different departments and the roles performed by different people in the organization. Also termed ‘swim-lane’ charts, these process maps have vertical lines showing the movement of the process from person to person.

Value Stream Mapping for Defining a Process

Value stream mapping visually represents the flow of materials and information throughout the organization. It visually shows the important parameters like cycle time, lead time, inventory or waiting time, % complete and accuracy, and the number of operators. Three important steps of VSM:

  • Create as-is current state process of how an organization delivers products and services to the customers
  • Identify wastes in the process and draw the proposed improved state map using lean principles
  • Finally, develop and implement action plans to achieve the proposed improved future state
How to Define a Process

In fact, depending on the business requirement, process mapping or value stream mapping can be used in the organization.  Use VSM to determine how much time the product spends on each step and to find the waste in the process. Process mapping is to visualize a series of steps and determine the decision-making within the process.

When to use process definition tools

Benefits

Defining a process provides an ideal opportunity to identify inefficiencies and sources of error.

  • It helps identify the duplicate or identical activities performed at different process steps.
  • Identify unnecessary tasks such as unnecessary approvals, handoffs, etc.
  • It helps identify an inefficient sequence of steps that leads to delays and reworks.
  • It helps identify unclear responsibilities, which leads to delays in decision-making.

How to define process video

When you’re ready, there are a few ways I can help:

First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.

* * *

If you’re looking to pass your Six Sigma Green Belt or Black Belt exams, I’d recommend starting with my affordable study guide:

1)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

2)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,000+ exam-like questions for Green Belts (2,000+ for Black Belts) with full answer walkthroughs, access to instructors, detailed study material, and more.

​ Thousands have used this system to prepare. Join them here. 

Business Assessment Process

A business assessment process is a continual cycle. In it, you look at your current situation, where you want to be, and figure out how to get there. Once you’ve achieved that desired situation, you repeat the process. It’s a continual cycle because businesses are always growing and evolving – ideally – to meet new challenges and opportunities.

Stages of a Business Assessment Process

  • Setting business objectives
  • Breaking objectives down into divisional and departmental goals
  • Prioritizing those goals for each division and department
  • Mapping the current state of the business in relation to those goals
  • Mapping the future (desired) state of the business in relation to those goals
  • Developing a project schedule that helps you reach the future state map, based on the prioritized goals
  • Executing those projects

Setting Business Objectives

Business objectives need to be focused on the wellbeing of the organization as a whole. They might include things like:

  • Increasing revenue
  • Improving company culture
  • Increasing customer satisfaction
  • Taking more market share
  • Improving brand recognition and visibility

Breaking Objectives into Goals

Once business objectives are set, the next stage of a business assessment process is to break them down into goals. These will be goals that individual divisions and departments can work towards. Depending on the structure of your organization, you might have multiple levels of goals, from division to teams, or a single layer.

Every goal should:

  • Be actionable by the specific group of people assigned to it. For example, marketing teams shouldn’t have sales target goals; development teams shouldn’t have customer service improvement goals.
  • Directly support one of the business objectives.
  • Be developed in collaboration with the people who will be working towards the goal.
  • Be measurable on at least a monthly basis so that employees can see their progress towards the goal.

These goals might include things like:

  • Boosting sales targets to support revenue increase objectives
  • Departmental team building and development to support corporate culture changes
  • Developing resources to support customer service teams in improving customer satisfaction.

Prioritizing Goals

When you have your goals decided, the next step is to prioritize them. This ensures that the most important are worked on first. Use a standard prioritization matrix or develop your own system of scoring each goal based on factors that are important to your business. Alternatively, merge this step with the project scoping and scheduling step.

Mapping the Current State

In this stage, look at where your company is in relation to your goals. You need to establish baselines so you can track progress. The metrics that you use will depend upon your specific goals, but should directly relate to each goal. For example, if your goal involves improving customer satisfaction, you might use a Customer Satisfaction Score (CSAT) or Net Promoter Score (NPS).

Mapping the Future State

Similarly to the previous stage, look at where you want your company to be. This isn’t a vague, vision-like requirement. Instead, use the metrics that you decided on for mapping the company’s current state. For example, if you chose Net Promoter Score as your metric, your future state might include a 2-point improvement in NPS over the next two years.

Develop a Project Schedule

This is where you move from where you want to be to how you’re going to get there. Your project schedule development process will depend on your company’s methodologies, but should include items like:

Executing the Project Schedule

Once you have a project schedule in place, the obvious job is to carry it out. This doesn’t just involve giving various teams the go-ahead; it also requires project management and tracking to make sure that it hits your goals. You can use tools like:

After You Complete a Business Assessment Process

Once you’ve finished moving through these stages, it might feel like the job is done. Right? Wrong. A business assessment process is cyclical; once you achieve a set of goals, you look for your next target. Think of it like a road trip; reaching day one’s destination doesn’t finish the overall journey.

When you’re ready, there are a few ways I can help:

First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.

* * *

If you’re looking to pass your Six Sigma Green Belt or Black Belt exams, I’d recommend starting with my affordable study guide:

1)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

2)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,000+ exam-like questions for Green Belts (2,000+ for Black Belts) with full answer walkthroughs, access to instructors, detailed study material, and more.

​ Thousands have used this system to prepare. Join them here. 

Process Performance Metrics

We can use many Process Performance Metrics to measure our processes’ current and future value.

Before we look at the metrics, let’s review some of the terms we’ll use. It’s important that you understand these terms as they’re used in Six Sigma.

Terminology

  • Defect: An end result (often a product) that doesn’t fall within a pre-defined acceptable range of values. These values might be a physical product’s strength and/or size measurements. For a service, these values might be KPIs like turnaround time. Generally, a defect is a failure to meet customer quality expectations.
  • Opportunity: A chance to add value for a customer. This applies to any situation in which your company can improve the perceived value of a product or service. For example, if you’re manufacturing a product to customer specifications, your opportunities might be:
    • Matching customer’s physical requirements
    • Meeting deadlines
    • Providing a free courier service straight to the customer.
  • Unit: A tangible result to a customer: a single service or product. For example, a customer’s phone call to your service department is a unit.
  • Yield: The yield is the percentage of opportunities that were successfully met. Another way to look at yield is the percentage of defect-free processes.
    Yield = (Opportunities - Defects) / Opportunities

Opportunity vs. Unit

It’s easy to get opportunities and units mixed up. The simplest way to differentiate them is to consider customer needs and requirements.

The item they need is the unit.

The specifications for that item (color, size, materials, time to delivery) are the opportunities.

You might have several opportunities per unit. For example, think about a customer calling a service line to get help with a piece of software. The unit, in this case, is the phone call. The opportunities could be:

  • Answering the phone call within an acceptable time range.
  • Having the phone call directed to an appropriate person.
  • Being able to help the customer with their problem.
  • Leaving the customer with a positive experience.

Process Performance Metrics – Defects per Opportunity (DPO)

DPO stands for Defects per Opportunity. This is a simple ratio. Take the number of defects you have in your process (usually found by sampling) and divide it by however many opportunities there are. Then, express the ratio as a percentage.

DPO = Defects / Opportunities

Complex processes and items often have many opportunities to add value. Hence, you might have several defects per process or item.

Example: A fast food drive-through order. The customer has a lot of criteria on which they’ll judge the experience as a whole:

  • Staff attitude
  • Speed of service
  • Accuracy (do the received items match the order?)
  • Presentation
  • Taste of the food
  • Freshness/heat of the food.

Each of these criteria is an opportunity to add value for the customer. A failure in any of these criteria detracts from value and counts as a defect. If the customer has to wait ten minutes (defect in the speed of service), receives the wrong burger (defect in accuracy), and their burger is lukewarm (defect in freshness/heat), three defects have each detracted value from the end result.

Potential gotcha: Ensure you use the same population’s defects and opportunities. For example, if you’re counting defects in a sample of 500 products, the number of opportunities must also apply only to that sample of 500 products.

Examples of Defects Per Opportunity

Let’s say Joe’s Burgers serves 1,000 customers a day. The company has identified its opportunity types as follows:

  • Accuracy
  • Speed
  • Freshness
  • Taste

For example, in a single day, 50 customers were given the wrong order, 75 felt they waited too long, 25 said their order was cold, and 50 more said their burgers just tasted bad.

Some of that feedback might have overlapped; customers might have received the wrong order and waited too long for it. That doesn’t matter for this metric because each order has multiple opportunities attached to it.

To calculate the number of opportunities, multiply the number of orders (1000) by the number of opportunity types (4) to get 4000.

DPO = number of defects / number of opportunities = 200/4000 = 0.05 = 5%

Process Performance Metrics – Defects per Unit (DPU)

Defects per unit is a similar calculation to DPO, but instead of looking at opportunities, we’re looking at units. See Opportunity vs. Unit above if you’re getting confused.

Let’s look at the Joe’s Burgers example again, but this time from a DPU viewpoint.

Examples of Defects Per Unit

Let’s say Joe’s Burgers serves 1,000 customers a day. In a single day, 50 customers had the wrong order, 75 felt they waited too long, 25 said their order was cold, and 50 more said their burgers just tasted bad.

Some of that feedback might have overlapped; customers might have received the wrong order and waited too long for it. That doesn’t matter for this metric. We’re just looking for a basic ratio.

(Note: it would matter if we discussed defective units per 1000, for example.)

The number of units is the number of orders (1000).

DPU = number of defects / number of units
DPU = 200/1000 = 0.2
DPU = 20%

Process Performance Metrics – Defects per Million Opportunities (DPMO)

DPMO is based on DPO, but it uses real-world manufacturing-type numbers. This is an important metric because it’s used in Six Sigma to measure the performance of a process. For example, Joe’s Burgers would use DPMO to determine how successful their current serving process is and how it compares to other serving processes they might have tried.

Defects per Million Opportunities are typically extrapolated from a sample. In the work examples above, we looked at Joe’s Burgers using a single day’s orders as a sample: 1000 units. If you’ve already worked out DPO for a sample, you can calculate DPMO by multiplying the decimal result (not the percentage) by one million.

DPMO = DPO * 1000000

Alternatively, you can use this equation:

DPMO = (Defects / Opportunities) * 1000000

Or:

DPMO = (Defects / (sample size * opportunities per unit)) *
1000000

Worked example of Defects Per Million Opportunities

Joe’s Burgers serves 1,000 customers in a day. The company has identified its opportunity types as follows:

  • Accuracy
  • Speed
  • Freshness
  • Taste.

In a single day, 50 customers had the wrong order, 75 felt they waited too long, 25 said their order was cold, and 50 more said their burgers just tasted bad.

Number of defects: 50 + 75 + 25 + 50 = 200
Sample size: 1000
Opportunities per unit: 4
DPMO = (Defects / (sample size * opportunities per unit)) *
1000000
DPMO = (200/(1000 * 4)) * 1000000
DPMO = 50000

How to Calculate 6 Sigma level based on DPMO

There are two basic ways that you can determine the Six Sigma level from your DPMO figure:

  • Look at an appendix table.
  • Use the equation.
Process Performance Metrics

Six Sigma Level Equation

Use this equation to calculate your process’s Six Sigma Level based on its DPMO:

Level = 0.8406 + √(29.37 - (2.221 * ln(DPMO)))

Note: If you’re wondering where the numbers 0.8406, 29.37, and 2.221 come from, they are constants that help us calculate the DMPO or level.

Process Sigma = 0.8406 + SQRT(29.37 – 2.221 * (ln(DPMO))).
Reference: Breyfogle, F., 2003. Implementing Six Sigma: Smarter Solutions Using Statistical Methods. 2nd ed. John Wiley & Sons.

Worked example of calculating Six Sigma Level

Let’s start with the DPMO figure from Joe’s Burgers: 50000.

Firstly, if you haven’t come across ln before, it means that you need to find the natural logarithm of the number, in this case, the DPMO. Use a scientific calculator. In this case, the natural logarithm of 50000 to 4 decimal places is 10.8198.

Secondly, we need to plug that into the equation:

Level = 0.8406 + √(29.37 - (2.221 * ln(50000))) 
Level = 0.8406 + √(29.37 - (2.221 * 10.8198))
Level = 0.8406 + √(29.37 - 24.0307)
Level = 0.8406 + √(29.37 - 24.0307) 
Level = 0.8406 + √5.3392
Level = 0.8406 + 2.3106
Level = 3.1513

Unlock Additional Members-only Content!

To unlock additional content, please upgrade now to a full membership.
Upgrade to a Full Membership
If you are a member, you can log in here.

First-Time Yield (FTY)

First-time yield is the most common way to calculate the process yield. It is the number of defect-free units coming out of a process compared to the number of units manufactured. In other words, it is the probability of a defect-free output from a process.

FTY does not capture how many defects are reworked in each stage. In other words, It doesn’t include units that must be reworked into defect-free units. It will not detect the effect of hidden factors.

FTY is the number of goods produced divided by the total number of parts going into the process.

How to calculate FTY for a process

  1. Calculate the first-time yield for each step in the process based on the number of defect-free units going into each step (typically, each step will have fewer units than the preceding step).
  2. Multiply the FTYs together to get the total first-pass yield.
FTYt = FTY1 * FTY2 * FTY3 * ... * FTYn

Where:

  • FTYt is the total First Time Yield for the process.
  • n is the number of steps in the process.

Worked example of calculating FTY

Example: In a manufacturing plant, 100 parts are entered into the first process, two are scrapped, and 98 defect-free parts go to the next stage. Five of the 98 parts that enter the second process are scrapped, and 93 defect-free parts go to the next stage. Ten of the 93 parts that enter the third process are scrapped, and 83 defect-free parts go to the next stage. Find the First time yield.

Process Performance Metrics
  • First process: 100 parts enter into process; 2 scrapped, So output 98 parts; FTY1 = (100 – 2)/100 =98/100= 0.98
  • Second process: 98 parts enter into process; 5 scrapped, So output 93 parts; FTY2 = (98 – 5)/98 =93/98= 0.9489
  • Third process: 93 parts enter into process; 10 scrapped, So output 83 parts; FTY3 = (93 – 10)/93 =83/93= 0.8924
Process Performance Metrics

Total First Time Yield = 0.98*0.9489*0.8924= 0.829 ~ 83% yield

FTY also can calculate the final number of defect-free parts divided by the number of parts at the start of the process = 83/100 = 83%

Rolled Throughput Yield (RTY)

Rolled Throughput Yield (RTY) is a great way to see a process’s health. RTY provides a probability that a process with no defects will generate a unit. In other words, it’s the probability that a multi-step process will produce a defect-free unit.

Rolled Throughput Yield is more powerful as it is sensitive to defects. Instead of being based on the yield on units, it uses the number of defects at each step (even if the defective part is corrected, it will still count in the calculation of RTY). It is valuable to the organizations as most of them consider only the successful/passed units, although inherent Muda is present. RTY considers total defects in the entire process.

Before calculating RTY, you need to complete two important steps:

  • Map the process so that you know how many steps it has.
  • Take samples at each stage of the process and test for defects so that you have data for the calculation.

Example

A sequence of 3 operations has first-pass yield (right first time) rates as follows:

  • 1st step: 93%
  • 2nd step: 87%
  • 3rd step: 92%.

In other words, the first step in a process has a 93% chance of completing correctly. The 2nd has only an 87% chance. And the third process step has a 92% chance.

The first pass yield rate for the whole process is the chance of each step multiplied.

Process Performance Metrics
RTY = 93% * 87% * 92% = 74%

Each step by itself had a good chance of being accepted. But when you take a look at the entire system, you see that the cumulative errors take a toll. In the above example, any item that the process produced only had a 74% chance of passing through without error or rework.

Worked example of calculating Rolled Throughput Yield

Example: In a manufacturing plant, 100 parts are entered into the first process, two are scrapped, and five are reworked to get the 98 parts to the next stage. The 98 parts enter into the second process, where five are scrapped and ten are reworked to obtain 93 parts. Ninety-three parts enter into the third process, where ten are scrapped and five are reworked to get 83 parts. Find the Rolled throughput yield.

  • First process: 100 parts enter into process; 2 scrapped and 5 reworked, So output 98 parts; RTY1 = (100 – (2+5))/100 =93/100= 0.93
  • Second process: 98 parts enter into process; 5 scrapped and 10 reworked, So output 93 parts; RTY2 = (98 – (5+10))/98 =83/98= 0.85
  • Third process: 93 parts enter into process; 10 scrapped and 5 reworked, So output 83 parts; RTY3 = (93 – (10+5))/93 =78/93= 0.84

So, the Total Rolled Throughput Yield = 0.93*0.85*0.84= 0.664 ~ 66% yield

Calculating DPU from Rolled Throughput Yield

In addition to the Defects Per Unit calculations above, you can use a process’s RTY to calculate its Defects Per Unit. Use this equation:

DPU = -ln(RTY)

Reminder: ln is the natural log.

Worked example of calculating DPU from RTY

From the above manufacturing example, RTY is approximately 66.4% (0.93 x 0.85 x 0.84 = 0.664). Then, to get the DPU, we plug that into the equation:

DPU = -ln(0.664)
DPU = 0.4095

Unlock Additional Members-only Content!

To unlock additional content, please upgrade now to a full membership.
Upgrade to a Full Membership
If you are a member, you can log in here.

Using Process Performance Metrics

Once you understand the Process Performance Metrics available and how to use them, the next step is to decide which metrics to use.

Primary vs. Secondary Process Performance Metrics

Primary and secondary metrics aren’t static. Each organization will have its priorities regarding Process Performance Metrics, leading to different lists of primary and secondary metrics. These lists will occasionally change as an organization’s focus and business objectives change.

Generally speaking, primary process performance metrics are the ones your organization decides to focus on most. The rest are secondary process performance metrics.

Questions to Ask When Designing Your Process Performance Metrics Program

The following information was emailed to me and attributed to Will Poats of the CEB.

Accounting and Reporting teams are always looking to include the most relevant metrics in their management reports, so they should avoid the three following missteps when incorporating metrics: wrong metric selection, lack of process ownership, and ineffective reporting practices.

Below are 13 questions you can ask yourself and your team members when designing or strengthening your metrics program.

  1. Have we chosen no more than 12 to 15 metrics for decision making among those suggested by the corporate finance leadership team and business partners?
  2. Do we agree on the definition for each metric, the reason for tracking it, and the target we are aiming for?
  3. Can we link each metric back to a business or corporate goal?
  4. Have we tested the metrics with our stakeholders to ensure they understand the definition and have a clear sense of how they will use the metric to make decisions?
  5. Check whether we incorporated both qualitative and quantitative metrics into our decision-making framework?
  6. Do we know which drill-down options are most useful for each metric?
  7. Also, do we know which styles of metrics presentation each stakeholder prefers?
  8. Have we run each metric during a trial period to establish a baseline?
  9. Check whether we agreed on refresh triggers or cycles for each metric to prevent them from becoming obsolete?
  10. Do we have a metric that can predict future problems?
  11. Have business partners feel comfortable alerting Finance when metrics need to change and adapt to the new environment?
  12. Do we eliminate old metrics when new ones become more representative?
  13. Finally, Do we update our business partners on metrics we will no longer be tracking when the dashboard changes?

Six Sigma Black Belt Certification Process Performance Questions:

Question: Which of the following performance measures is most appropriate for evaluating the tangible effects of a Six Sigma project? (Taken from ASQ sample Black Belt exam.)

a) Cycle time

b) Team member absentee rate

C) Employee morale

D) Unsolicited compliments from customers

Answer:

Unlock Additional Members-only Content!

To unlock additional content, please upgrade now to a full membership.
Upgrade to a Full Membership
If you are a member, you can log in here.

Question: Which of the following is the correct formula for DPMO?

(A) D/TOP
(B) DPO X 1,000,000
(C) D X U XOP
(D) DPU/DPO

Answer:

Unlock Additional Members-only Content!

To unlock additional content, please upgrade now to a full membership.
Upgrade to a Full Membership
If you are a member, you can log in here.

ASQ Six Sigma Green Belt Process Performance Questions

Question: Which of the following measures is used to show the ratio of defects to units?
(A) DPU
(B) DPO
(C) DPMO
(D) PPM

Answer:

Unlock Additional Members-only Content!

To unlock additional content, please upgrade now to a full membership.
Upgrade to a Full Membership
If you are a member, you can log in here.

When you’re ready, there are a few ways I can help:

First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.

* * *

If you’re looking to pass your Six Sigma Green Belt or Black Belt exams, I’d recommend starting with my affordable study guide:

1)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

2)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,000+ exam-like questions for Green Belts (2,000+ for Black Belts) with full answer walkthroughs, access to instructors, detailed study material, and more.

​ Thousands have used this system to prepare. Join them here. 

Business Process Management

What is Business Process Management?

Business Process Management is a way to understand, control, and improve an organization’s processes to deliver value to stakeholders. Moreover, this is a key concept of Six Sigma. You want to use systematic methods to create the best possible business results instead of improving local components.

Most organizations work as functional groups such as design, production, R&D, sales and marketing, production, quality, information technology, etc. All these functional groups aim to produce the product or service for the customers. However, often these functional groups work in silos. For that reason, business process management helps manage the entire process, including determining the responsibilities of functional groups.  

Business process management ensures that all the processes operate smoothly without delays or lack of resources. In other words, the basic aim of a business system is to ensure that the processes, products, and services are subjected to continuous improvement. A business system must explicitly provide scope for collecting and analyzing data from processes and other reliable sources to ensure continuous improvement in processes, products, and services.

Deming Customer Model:

As per Deming, quality is a product or service that provides value to the customers or stakeholders. To understand, control, and improve the business process, he proposes the following key concepts:

  • Process inputs, controls, and outputs are each interdependent.
  • Use statistical models to control and guide these inputs.
  • Use process feedback to redesign existing systems and make them better.
Business Process Management

Juran Measures Quality:

Juran has three dimensions for measuring the quality of a process:

  • Effectiveness: How well does the output meet the customer’s needs?
  • Efficiency: The ability to be effective at the least cost.
  • Adaptability: How well you can be effective and efficient in the face of change.

What are Business Processes?

A business process is a collection of interrelated operations that deliver products and services to the customer. Following that logic, the business process can be visualized in a flow map or process matrix. Business processes will help the organization to achieve its objectives accordingly. Thus, Six Sigma plays a vital role in understanding and improving the business process.

Business Process Management

Every activity will have three elements (input, process, and output) that affect its function. Describe the relationship among various business processes (design, production, purchasing, accounting, sales, etc.) and the impact these relationships can have on business systems. A business process is a series of actions, changes, or functions bringing about a result or value to the customers or stakeholders.

Types of Processes 

  • Operational processes: Operational processes focus on executing the primary tasks of a business. Hence, they are also called “core business processes”. For example, customer service, manufacturing, delivery, etc.
  • Management processes: Management processes ensure the operational processes are performing as planned. For example, planning, monitoring, etc.
  • Governance processes: These processes ensure the core business is working in full compliance with statutory and regulatory requirements. For example, legal, quality, compliance, etc.

Why Business Process Management?

  • A business process is an organizational asset that creates value for the customer.
  • Organizations need to measure, monitor, analyze, and control the process to deliver consistent value to the customer.
  • The main aim of business process management is to improve revenue and reduce costs.
  • Create an efficient work environment.
  • Improves quality and enhances customer satisfaction

Tools and Techniques to Enable Business Process Management

SIPOC

The acronym for SIPOC stands for Supplier, Input, Process, Output, and Customer. A SIPOC is a high-level process mapping tool to help visualize a process and its influences. In other words, it is a useful tool that depicts how a process serves the customer and summarizes the inputs and outputs of a process in a visual format. 

Process Performance Metrics

We can use many Process Performance Metrics to measure our processes’ current and future value. Once you understand the Process Performance Metrics available and how to use them, then the next step is to decide which metrics are most appropriate.

KPIV, KPOV

Key process input variables (KPIVs) may be analyzed to determine the degree of their effect on the process output variables. It is also known as KPOVs. Hence, KPIV is the prime factor determining the key process output variable (KPOV) or product quality. Furthermore, we use key performance indicators (KPIs) and key process output variables as metrics to tell us how we’re doing.

Stakeholder Analysis

Stakeholder analysis identifies people who have a stake in our product. We use stakeholder analysis before planning a project because we need to know who we need to talk to and what we’ll need from them.

Benchmarking

Benchmarking is an improvement process in which a company measures its current methods and performance, compares them against a standard, and then measures them against world-class performers / best-in-class companies. Once the comparisons are complete, you then combine the best of your process and theirs to create the best possible performance. 

Critical to X.

Critical to X requirements are elements of a project that are important to the end customer. Six Sigma projects can aim to improve any of the CTX requirements.

Advantages of Business Process Management

  • Easy to monitor and control business processes
  • It provides management with an increased ability to identify the bottlenecks
  • Increased ability to identify the areas of optimization to improve customer satisfaction
  • Helps to reduce the lead times
  • Clearly determines the roles and responsibilities of the individuals

Helpful resources

Business Process Management Videos

When you’re ready, there are a few ways I can help:

First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.

* * *

If you’re looking to pass your Six Sigma Green Belt or Black Belt exams, I’d recommend starting with my affordable study guide:

1)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

2)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,000+ exam-like questions for Green Belts (2,000+ for Black Belts) with full answer walkthroughs, access to instructors, detailed study material, and more.

​ Thousands have used this system to prepare. Join them here.