Interrelationship Digraph (Network Diagram)

interrelationship diagraph
interrelationship diagraph

If you’re like me and you thought the spelling of Digraph was an error, it’s not. The difference between a digraph and a diagram is that a digraph is a graph emphasizing direction. A diagram can be any image outlining a plan or how something works. However, many articles on the web relate Interrelationship Digraph and Interrelationship Diagrams as the same thing. Other names for this tool include Relations Diagram or Network Diagram. It is a distinct tool from the Matrix Diagram, a separate 7M tool used to show many-to-many relationships in a grid rather than a free-form map. Quality Function Deployment (QFD), also known as the House of Quality, is itself built on a matrix diagram, not an interrelationship digraph, a common point of confusion on exams.

The Interrelationship Digraph is a 7M tool. It often uses input from other tools, like a Fishbone Diagram or an Affinity Diagram, to define drivers and outcomes in a process. An Interrelationship Digraph helps you see relations and influences between several concepts, even if those concepts are very different. You can also use it to identify critical issues and key drivers of a problem.

Uses of Interrelationship Digraphs

Interrelationship Digraphs encourage participants to view processes outside of a linear framework. Unlike a Fishbone Diagram, which singles out the main input to a process, the Interrelationship Digraph encourages multiple inputs and outputs. As a result, multiple root causes are drawn from the digraph.

Interrelationship Digraphs are best deployed in groups for the purpose of brainstorming ideas. Also, heavily consider drafting digraphs within a cross-functional team to capture everyone’s point of view. If done alone, the digraph may come across bias with limited function.

When to Use an Interrelationship Digraph

The strength of an Interrelationship Diagram comes from its ability to visualize relationships between complex processes. As arrows are plotted on the board, participants will see connections between ideas.

Because Interrelationship Digraphs identify multiple drivers and outcomes in a given scope, this tool is best used for complex issues. The interrelationship Digraph helps team members break down the complexity of the subject at hand. When properly used, Interrelationship Digraphs will provide the team with more avenues to explore critical x-factors. X-Factors are any variables that cause something to occur.

Should Affinity Diagrams, Tree Diagrams, or Fish Bone Diagrams Proceed with Interrelationship Digraphs?

The more, the merrier, in my opinion! Each of these visual aids is a tool to define your objective. Creating an Interrelationship Digraph will more fully explore how ideas connect after conducting an Affinity, Fishbone, or Tree Diagram. Also, the need for each of these tools depends on how well your team understands the project. Always consider how you can prove to stakeholders that your team completely understands the project.

Steps to Construct an Interrelationship Digraph

Let’s consider an example of a company that wants to source a new Electronic Resource Planning System (ERP). ERPs are databases used in large businesses to organize information and create reports across multiple departments. In this example, we will consider eight different departments found in a manufacturing environment.

Step 1: Draft a Statement

Draft a statement for the Interrelationship Diagram to explore. Consider using your Problem Statement found from the Project Charter if available. Write the statement on a whiteboard for all participants to see.

In this case, the statement is “Which Department is Most Impacted by an ERP System?”

Interrelationship Digraph
Step 1. Draft a Statement

Step 2: Brainstorm Key Factors

Next, have participants brainstorm key factors related to the statement. Each participant writes their ideas on a card or sticky note. You may gather ideas using the other 7M tools in advance.

In the case of our ERP system, participants brainstormed eight departments that are primary users of the ERP system.

Interrelationship Digraph
Step 2: Brainstorm Key Factors

Step 3: Categorize the Information

Once participants have finished brainstorming, place one idea on the work surface and determine the relationships between the other ideas. Be sure to plot similar ideas in the same vicinity. Repeat till all ideas are on the board.

In our example, the team placed departments in the same vicinity based on how regularly they interacted with each other. Note how Production Planning and Accounting are centralized on the board. This shows that most departments have a hand in either of those two groups.

Interrelationship Digraph
Step 3: Categorize the Information

Step 4: Analyze the Diagram

Ask the team, “How does this idea influence the other ideas?” Draw arrows from each idea to the one it influences. Ideas that have arrows going out from them are causes or X factors. Ideas that have arrows coming to them are effects or Ys. Consider writing an explanation alongside the arrows to validate connections.

Repeat for all ideas. In the example below, the team has drawn their arrows. Team members begin to see which departments are drivers or outcomes. The concepts with only arrows going out are considered drivers, and the concepts with only arrows coming in are considered an outcome. With that said, we find there is only one true driver: Quality Assurance. All other departments are nested between causes and effects.

Interrelationship Digraph
Step 4: Analyze the Diagram

Step 5: Count the Arrows

Last, count the arrows pointing to and from each idea and record the totals. The ideas with the highest arrow counts deserve special attention.

Back to our example, we see that Quality Assurance is one of the main drivers, which means the new ERP system must consider how QA will operate with the new program. We can also see that Accounting is the most affected department. We can conclude that the most important stakeholder in the new ERP system is Accounting, so buy-in from finance is crucial.

Interrelationship Digraph
Step 5: Count the Arrows

All in all, Quality assurance is the main driver. Accounting will experience the greatest outcome of the ERP system. Lastly, all departments, except for HR, impact one another to some degree. Although each department has a say in the new ERP system, QA and Accounting hold the greatest weight when deciding capabilities and functions.

Additional Resources for Interrelationship Digraphs

When you’re ready, there are a few ways I can help:

First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.

* * *

If you’re looking to pass your Six Sigma Green Belt or Black Belt exams, I’d recommend starting with my affordable study guide:

1)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

2)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,000+ exam-like questions for Green Belts (2,000+ for Black Belts) with full answer walkthroughs, access to instructors, detailed study material, and more.

​ Thousands have used this system to prepare. Join them here. 

Activity Network Diagram

activity network diagram
activity network diagram

An Activity Network diagram is a 7M tool that graphically depicts your project timeline. It helps visualize the information you need to map out tasks in order of occurrence and to label each with the best, worst, and average case times needed to complete them. You can then use PERT and CPM techniques to incorporate the information into the project plan. Using an Activity Network Diagram to manage your project is an excellent way to stay on top of deadlines and keep the project on track.

An Activity Network diagram helps you:

The primary intent of creating an Activity Network Diagram is to create a flow chart showing the necessary tasks for a project in sequence order (including parallel and serial paths).

  • Identify critical tasks
  • Identify bottlenecks
  • Identify time tables.
  • Determine the activities that the team must complete
  • Create a timeline for tasks and activities
  • Determine the order of activities

How to make an Activity Network Diagram

Activity Network Diagrams help manage the development of projects, especially for organizations that have listed activities performed at a particular time.

Step 1: List all of the tasks in the project

First, you should gather the list of the complete tasks of the organization that are required to complete the proposed project.

Step 2: Put in Chronological order

Then, arrange them in chronological order- in other words, according to the order of the execution of each task.

If a task depends on another, be sure that that task is further down the timeline than the one needed. For example, if Task A needs tasks B and C to complete before they can be performed, put B and C before task A.

If tasks can be executed simultaneously, draw them in parallel.

Step 3: Label Optimistic, Pessimistic, and Most Likely times

Most-likely time: The time that you will likely need to complete the project.

Most optimistic time: The shortest amount of time to complete the task.

Most pessimistic time:  The longest amount of time to complete the task.

Step 4: Calculate the Critical Path

Calculating the Critical Path gives you the shortest time through the entire project. It helps you determine the order of executing necessary tasks. This is important because the project will never be completed quicker than the critical path.

Tasks on the critical path have zero slack (also called float): how long a task can slip without delaying the overall project. Tasks not on the critical path have some slack, meaning they have a little room to run late without pushing back the project end date.

Step 5: Review and look for Efficiencies

Look for ways to shorten your critical path. Re-evaluate the task dependencies. Is there any way you can move tasks around to complete the project faster? Where are your bottlenecks? Can you subdivide any of these tasks? Can you think of ways to complete these tasks in parallel?

When you’re ready, there are a few ways I can help:

First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.

* * *

If you’re looking to pass your Six Sigma Green Belt or Black Belt exams, I’d recommend starting with my affordable study guide:

1)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

2)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,000+ exam-like questions for Green Belts (2,000+ for Black Belts) with full answer walkthroughs, access to instructors, detailed study material, and more.

​ Thousands have used this system to prepare. Join them here. 

Tree Diagram

A tree diagram is an analytical and planning tool used to break down problems progressively into greater detail by partitioning bigger problems into smaller ones. It is also called a hierarchy diagram, systematic diagram, and analytical tree. It is one of the seven management tools. These tools are used for planning and managing operations effectively. The basic purpose of the 7M tools is to guide managers in planning, analysis, and decision-making.

A tree diagram helps you break down big concepts into progressively greater detail. The idea here is to systematically break down a concept into its constituent pieces.

The tree diagram starts with one item that branches into two or more. The branch further split into two or more, and so on. It looks like a tree with a trunk and multiple branches.

Why Use a Tree Diagram

The objective of the tree diagram is to partition a big idea or problem into finer levels of detail. Doing this will make the idea easier to understand or the problem easier to solve. Developing the tree diagram helps you think step by step from general to specific.

You would progress from left to right with the highest order items / most essential concepts on the left. You would start with the “whys” and progress to the “hows.” Alternately, you would start with the “goals” and progress to the “means” of achieving those goals. Furthermore, it is one of the analytical tools for quality improvement programs.

Tree diagrams are helpful tools outlining details related to a problem, idea, process, or plan.

When to Use Tree Diagram

The Six Sigma team uses a tree diagram to analyze the process in detail. It helps to develop a systematic step-by-step strategy to achieve the goal. It is one of the root cause analysis techniques like the 5Why, which is used to identify root causes in a step-by-step method. However, the 5Why handles only one cause at a time, but the tree diagram can narrow down and address multiple possible causes in a diagram.

The purpose of the tree diagram is to explore the ways and means to achieve the project objective. Develop a list of alternative means and ways to present them in a visually understandable form.

An Interrelationship diagram helps you see relations and influences between several concepts. Similarly, the Affinity diagram gathers all ideas from the team brainstorming session and groups them based on their natural relationship. These tools help to present the data in a useful way, but taking action or implementing solutions requires further analysis. Hence, the Six Sigma team uses a tree diagram after other analytical tools uncover the issues.

How to create a Tree Diagram

  • Determine the goal statement of the project or problem. Place the goal on the top or left side of the diagram based on a vertical tree or horizontal tree.
  • Identify key tasks and subtasks to be accomplished to achieve the project goal.
  • Brainstorm all possible answers for each task and subtask. The diagram is to progress from generic to more specific.
  • Verify all the items and identify any additional tasks that must be included in the tree to achieve the goal.
  • Continue the exercise till you reach the fundamental elements. In other words, continue until all possible options are exhausted.

Advantages

  • Visualization is a simple and easy way to construct a diagram.
  • It is easy to understand the dependencies.
  • It is comprehensive- represents the outcomes, and traces up to the project’s goal.
  • Great flexibility: easy to use in any field to assist management.

Disadvantages

  • Though it is easy to construct, often confusing with whole diagram visualization of information.
  • Cumbersome with various branches after a certain limit.
  • Difficult to add new branches in the middle, as it needs to move the total structure to the lower levels of the tree.

“If you choose not to decide, you still have made a choice.”

Rush lyrics

Tree diagrams benefit from affinity diagrams.

An affinity diagram is one of the planning tools used to gather all ideas from the team brainstorming session. The diagram groups them based on their natural relationship. It only helps to present useful ideas, but taking action or implementing solutions requires further analysis. In contrast, the tree diagram progressively breaks down problems by partitioning bigger problems into smaller ones. A tree diagram is a systematic diagram; it visually depicts the tasks and subtasks to be accomplished to achieve the project goal.

Tree Diagram Videos

Six Sigma Black Belt Certification Tree Diagram Questions:

Question: After the major headings of a tree diagram have been broken into greater detail, what next step should be taken? (Taken from ASQ sample Black Belt exam.)

(A) Assemble the right team.
(B) Review the diagram for logical flow and completeness.
(C) Revise the problem statement.
(D) Choose the tree diagram goal statement.

Answer:

Unlock Additional Members-only Content!

To unlock additional content, please upgrade now to a full membership.
Upgrade to a Full Membership
If you are a member, you can log in here.

Question: A tree diagram can be used to do which of the following?

(A) Allow a team to identify root causes even when no credible data exist.
(B) Show a causality relationship.
(C) Present data from a check sheet.
(D) Reveal the true level of a problem’s complexity.

Answer:

Unlock Additional Members-only Content!

To unlock additional content, please upgrade now to a full membership.
Upgrade to a Full Membership
If you are a member, you can log in here.

Affinity Diagram (or K-J method)

Affinity Diagrams are used to reduce larger processes to a few key steps. Possibly invented by Jiro Kawakita and thus sometimes referred to as the K-J method, an affinity diagram is a good technique for identifying & displaying potential root causes for unfamiliar problems.

Very similar to a cause-and-effect diagram, in that individually generated ideas are segregated into categories used to organize facts and data on an unfamiliar subject. Unlike brainstorming, which is a group discussion, affinity diagramming starts with each team member generating ideas quietly and independently (see Step 1 below) specifically to avoid one voice dominating the others. Affinity diagrams help you organize ideas into meaningful categories by recognizing common groupings. This method helps you reduce large amounts of data into a smaller set.

For example, if you send out a survey to a large team asking for ideas on how to improve the team, you’ll get as many unique ideas as you have people. But, if you group submissions into themes, you’ll have a great list of groupings. This allows you to set strategy higher rather than trying to attack each item individually.

The affinity diagram requires the least amount of preliminary knowledge compared to other management tools. Matrix diagrams, prioritization matrices, and activity network diagrams all require significant prior knowledge.

How to Create an Affinity Diagram?

Step 1: Gather Ideas

Quietly, individually, the team gathers a bunch of ideas. It could be on Post-it notes or in private survey results. The idea is that no one team member influences the others, as opposed to brainstorming.

Ex. A team returns from Six Sigma for Process Owner training. They think the ideas have merit. But they are concerned that their organization’s culture will put up too many roadblocks for them to bring the ideas to fruition.

The team leader, a Six Sigma Black Belt, gets the entire team into a room, buys them pizza, hands them sticky notes, and asks them to write down their concerns on a sticky and leave it on the board.

Be sure just to get all of the ideas on the board first. Don’t start categorizing them until idea generation is complete. If you do, you risk adding bias and marginalizing some of the participant’s ideas.

Gather Ideas
Photo by Eugene Kim

Step 2: Organize

Now we organize the ideas into large groupings.

Feedback like ‘Our accounting systems can’t handle data in a process-centric way’ sounds a lot like ‘No way to get cost measures.’

‘Individuals are not rewarded for performance’ sounds similar to ‘processing associates judged on call handle time, not customer satisfaction.’

Group all the ones that sound similar until you get a critical mass.

Step 3: Label groupings

Put Affinity titles on the groupings. You have to call them something, right?!

Affinity Diagram
Photo by d_jan

Step 4: Create an action plan

Everyone forgets this part! Use the affinities to create workable projects. And done! You have created an affinity diagram.

Affinity Diagram Videos

When you’re ready, there are a few ways I can help:

First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.

* * *

If you’re looking to pass your Six Sigma Green Belt or Black Belt exams, I’d recommend starting with my affordable study guide:

1)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

2)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,000+ exam-like questions for Green Belts (2,000+ for Black Belts) with full answer walkthroughs, access to instructors, detailed study material, and more.

​ Thousands have used this system to prepare. Join them here. 

Six Sigma Tools: The Complete List by DMAIC Phase

If you’ve studied for a Six Sigma exam, you’ve met dozens of Six Sigma tools: FMEA, Pareto charts, Control Plans, Fishbone diagrams. Each one is taught on its own page, with its own formula or procedure. What’s harder to find is one place that shows all the major tools at once. Better still, organized by where they get used in a project. That’s what this page is for.

Six Sigma tools are the specific techniques, templates, and statistical methods a project team uses to move through DMAIC (Define, Measure, Analyze, Improve, Control). DMAIC is the problem-solving framework at the center of every Six Sigma project. Some tools are purely qualitative. For example, a Fishbone diagram is just a structured conversation. Others, like a hypothesis test, are rigorously statistical. Most projects use a mix of both. Below, the major Six Sigma tools are grouped by DMAIC phase. After that come the cross-cutting Lean tools and the classic “7 tools” sets that appear on every certification exam.

Two things trip people up when they first look at a list like this. First, not every tool belongs to exactly one phase. For instance, Process Mapping often gets redone in Measure and again in Improve. Similarly, Control Charts can baseline a process in Measure and sustain it in Control. So the groupings below show where each tool is most commonly introduced. They are not a hard rule. Second, more tools doesn’t mean a better project. The best Black Belts pick the smallest set of tools that answers the question in front of them. They don’t force every tool into one project to prove they know it.

Define Phase Tools

The Define phase establishes what problem you’re actually solving, for whom, and why it matters. These tools get the team, the sponsor, and the customer agreeing on one problem. That happens before anyone collects data. Rushing this phase is a common reason projects stall. A team that disagrees on scope in week one will usually discover it in week six, after a lot of wasted analysis.

  • Project Charter: the foundational document for the project. It states the business case, problem, goal, scope, and team roles. It’s the first thing a Belt builds. It stays the reference point for the whole project.
  • SIPOC: a high-level process map showing Suppliers, Inputs, Process, Outputs, and Customers. It’s the fastest way to establish process boundaries before diving into detailed mapping.
  • Voice of Customer (VOC): the structured process of capturing what customers need. Teams use surveys, interviews, complaints, or observation, then translate the needs into measurable requirements.
  • Critical to Quality Tree (CTQ): translates a broad customer need into specific, measurable quality requirements a process must hit.
  • Critical to Cost (CTC): the same translation exercise as a CTQ tree, focused specifically on the cost drivers a customer or business cares about.
  • Critical to Safety (CTS): identifies the safety requirements a process or product must meet. It’s often used alongside CTQ in regulated industries.
  • Stakeholder Analysis: identifies everyone who influences or is affected by the project. It also maps how to manage and communicate with each one.
  • Communications Plan: formalizes who needs what information, how often, and through which channel, for the life of the project.

Measure Phase Tools

The Measure phase establishes a factual baseline for how the process performs today. It comes before anyone proposes a fix. This is also where a surprising amount of project time gets spent, not on fancy analysis, but on making sure the data being collected is trustworthy in the first place. A Measurement Systems Analysis that gets skipped here tends to quietly undermine every statistical conclusion drawn later.

  • Data Collection Plan: specifies what data will be collected, how, by whom, and how often. Writing it first saves the team from reworking a messy dataset later.
  • Check Sheet: a simple form for tallying data by hand where it occurs. It’s often the first data-collection tool a team builds.
  • Process Mapping: a visual, step-by-step diagram of how work actually flows through a process today, as opposed to how it’s assumed to flow.
  • Histogram: a bar chart showing how often different value ranges occur. It’s the fastest way to see a process’s shape, center, and spread.
  • Pareto Chart: a bar chart ranking causes by frequency or impact. It’s built on the 80/20 rule: a few causes usually drive most of the problem.
  • Box Plots: a compact summary of a dataset’s median, quartiles, and outliers. It’s especially useful for comparing several groups side by side.
  • Measurement Systems Analysis (MSA): verifies that the measurement system itself can be trusted. That covers the gauge, the method, and the people measuring.
  • Gage R&R: a specific MSA study. It splits measurement variation into the gauge itself (repeatability) and the people using it (reproducibility).
  • Control Charts: time-ordered plots that separate normal variation from special-cause variation. The special causes are the ones worth investigating. See also the specific chart types: I-MR, XmR, and EWMA.
  • Process Capability (Cp & Cpk): measures whether the process, as it runs today, can consistently meet customer specification limits.

Analyze Phase Tools

The Analyze phase moves the team from “here’s the baseline” to “here’s what’s causing the problem.” It uses both structured brainstorming and statistical testing. The discipline here is resisting the urge to jump to a favorite fix. The qualitative tools (Fishbone, 5 Whys) list the suspected causes. Then the statistical tools (Hypothesis Testing, Regression) confirm or eliminate each suspect with evidence.

  • Cause and Effect Diagram (Fishbone/Ishikawa): a structured brainstorming tool that sorts possible causes into categories, commonly the 6Ms. The categories branch off a central “spine” toward the effect.
  • 5 Whys: a simple root-cause technique of repeatedly asking “why” to peel back symptoms and reach the underlying cause of a problem.
  • Root Cause Analysis: the umbrella discipline of finding the true cause of a problem instead of treating symptoms. It usually combines several tools on this page.
  • Failure Mode Effects Analysis (FMEA): a systematic risk-assessment tool. It scores failure modes by severity, occurrence, and detection to show which risks need action first.
  • Hypothesis Testing: the statistical framework for deciding whether a difference in your data is real. The alternative is that chance alone explains it.
  • Regression Analysis: a statistical method for modeling how inputs relate to an output. It measures how much the output moves when an input changes.
  • Scatter Diagrams: a quick plot of two variables against each other. It’s often the first check for a relationship, before a formal regression.
  • Multi-Vari Study: a structured way to observe a process without changing it. It narrows down which family of variation drives the problem: within-unit, between-unit, or over-time.
  • Cause and Effect Matrix (X-Y Diagram): a scoring matrix for input variables (X’s). It ranks each one by how strongly it affects the outputs (Y’s) the customer cares about.
  • TRIZ: a problem-solving method built from patterns in thousands of patents. It helps find creative solutions that resolve a contradiction instead of compromising.

Improve Phase Tools

The Improve phase is where the team generates, tests, and selects the actual solution, then pilots it before a full rollout. This phase uses two families of tools. Creativity tools help a team generate and organize solutions (Affinity Diagram, Tree Diagram). Verification tools confirm a solution works at small scale first (DOE, a pilot run).

  • Design of Experiments (DOE): a rigorous way to test several factors at once. It shows which factors, and which combinations, drive the outcome.
  • Value Stream Mapping: maps the full flow of material and information needed to deliver a product or service. Its purpose is to separate value-added steps from waste.
  • Kaizen: a focused, rapid-improvement event aimed at removing one source of waste quickly. The word also names a broader philosophy of small, continuous improvements.
  • Poka-Yoke (Error-Proofing): designs a process so a specific mistake becomes impossible or is caught immediately. It replaces inspection after the fact.
  • 5S: a workplace organization method (Sort, Set in Order, Shine, Standardize, Sustain). It removes clutter and variation from the workspace itself.
  • SMED (Quick Changeovers): a method for radically reducing the time it takes to switch a process or machine from running one product to running another.
  • Pugh Analysis: a structured decision matrix for comparing several candidate solutions against a baseline, across multiple weighted criteria.
  • Tree Diagram: breaks a broad goal down into progressively more specific tasks and sub-tasks needed to achieve it.
  • Affinity Diagram: organizes many separate ideas into natural groups. It helps make sense of brainstorming on an unfamiliar problem.
  • Interrelationship Digraph: maps cause-and-effect links between connected issues. It shows which issues are root drivers and which are downstream effects.
  • Prioritization Matrix: ranks competing options against shared, weighted criteria. That focuses effort where it has the most impact.
  • House of Quality (QFD): translates customer requirements into design characteristics. That way, what gets built maps back to what the customer asked for.

Control Phase Tools

The Control phase locks in the gains from Improve. Otherwise the process quietly drifts back once the team moves on. This phase is the most likely to be shortchanged under deadline pressure. That’s backwards. A fix with no monitoring plan is temporary, no matter how good the solution was.

  • Control Plan: documents how the new process will be monitored. It names who owns each check, how often it runs, and what to do if a measurement goes out of range.
  • Statistical Process Control (SPC): the ongoing use of control charts on a live process. It separates normal variation from a real shift that needs action.
  • Standard Work: documents the current best way to perform a task. As a result, the improvement is followed consistently instead of left to habit.
  • Response Plan: a control-phase tool named in the IASSC BOK. It’s a predefined plan for the moment a metric goes out of control, so nobody improvises under pressure.

Lean Tools (Used Across Every Phase)

Lean tools focus on removing waste and improving flow. They show up throughout a Lean Six Sigma project, not in one DMAIC phase. The DMAIC tools above are mostly diagnostic: they find what’s wrong and prove it. Lean tools, by contrast, are prescriptive. They remove a known type of waste once you’ve found it. That’s why Lean and DMAIC tools often pair up. For example, a Spaghetti Diagram (Lean) reveals wasted motion, and a revised Process Map (DMAIC) documents the fix.

  • Classic Wastes (the 8 Wastes): the standard Lean checklist of waste types, often remembered as TIMWOODS. It trains your eye to spot non-value-added work.
  • Kanban: a visual signal that pulls work through a process based on real downstream demand. It replaces pushing work from a forecast.
  • Spaghetti Diagram: traces the physical path a person, part, or document takes through a workspace. It usually exposes an absurd amount of travel at a glance.
  • 8D Method: an 8-step, team-based problem-solving method common in automotive and manufacturing. It runs from containing a problem to preventing it from coming back.

The Tools You’ll Actually Use Most Often

Every one of these Six Sigma tools earns its place in some BOK. In practice, though, a handful carry most real projects. Say you had time to master five tools before a real project, not an exam. Practitioners consistently name the same short list:

  • Process Mapping, because almost nothing else is possible until the team agrees on how the process really works today.
  • Cause and Effect (Fishbone) Diagram, because it’s the cheapest way to get a team’s knowledge onto one page. It comes before any statistics.
  • Pareto Chart, because it answers the single most useful question on any project: out of everything that could be wrong, what’s actually worth our time?
  • Control Charts, because they follow a process from Measure through Control. They baseline the process and later prove the fix held.
  • FMEA, because it forces a team to think about failure before it happens, rather than reacting to it after a customer finds it first.

That’s no reason to skip the rest. A true root-cause question will need Hypothesis Testing or DOE. Similarly, a project with a safety or planning angle will need the qualitative Improve tools. But if the full list feels overwhelming, get comfortable with those five first.

The Classic “7 Tools” Sets

Two groupings of Six Sigma tools show up by name on nearly every certification exam. Know them as named sets, not just as single tools.

  • The 7 Basic Quality Tools: the original quality-control toolkit. It includes the Cause and Effect Diagram, Check Sheet, Control Chart, Histogram, Pareto Chart, Scatter Diagram, and Process Mapping (sometimes taught as a Flowchart). Every one of these has its own dedicated page above.
  • The 7 Management and Planning Tools: a newer, more qualitative set for planning complex, non-numerical problems. It includes the Affinity Diagram, Interrelationship Digraph, Tree Diagram, Prioritization Matrix, Matrix Diagram, PDPC, and Activity Network Diagram.

Choosing the Right Tool

With this many Six Sigma tools, the skill is not memorizing them all. It’s knowing which tool fits the question you’re asking. A few quick rules of thumb:

  • If you need to agree on what the problem is, reach for Define phase tools (Project Charter, SIPOC, VOC, CTQ).
  • If you need to know how big the problem is right now, reach for Measure phase tools (Process Mapping, Histogram, Control Charts, Process Capability).
  • If you need to know why it’s happening, reach for Analyze phase tools (Fishbone, 5 Whys, Hypothesis Testing, Regression).
  • If you need to test or implement a fix, reach for Improve phase tools (DOE, Kaizen, Poka-Yoke, Pugh Analysis).
  • If you need to make sure the fix sticks, reach for Control phase tools (Control Plan, SPC, Standard Work).

Here’s how that plays out on an actual project. Say a Green Belt is asked to fix a call center’s slow response times. The project doesn’t start with a statistical test. Instead, it starts with a Project Charter to pin down the scope: which queue, which customers, what counts as “too slow.” It also needs a SIPOC to confirm where the process actually begins and ends.

Only once that’s settled does the team build a Process Map and start pulling Control Chart data to see what “normal” currently looks like. If the data shows real, unexplained variation, a Fishbone Diagram and a few rounds of 5 Whys narrow the list of suspects, and Hypothesis Testing confirms which suspected cause is statistically real versus which one just looked convincing in a meeting. Only then does the team move to Kaizen or a small DOE to test a fix, and finally a Control Plan to make sure response times don’t quietly drift back up three months later. Notice that the team never needed all 40-plus tools. They needed about seven, in a specific order, each answering one question.

Most real projects don’t use every Six Sigma tool on this page. They use the handful that answer the question in front of the team. If you’re studying for a certification exam, your belt’s body of knowledge tells you which tools you must know in depth and which you only need to recognize. For example, a Yellow Belt should recognize most tools here. A Black Belt, by contrast, should run the statistical ones (hypothesis testing, regression, DOE) without guidance.

Frequently Asked Questions

How many Six Sigma tools are there?

There’s no single official count. Different bodies of knowledge (ASQ, IASSC, Villanova) name somewhat different lists. Also, some tools overlap with general project management or Lean. This page covers about 40 of the most commonly taught Six Sigma tools, grouped by DMAIC phase. That covers most of what any certification body will test.

Which Six Sigma tools does a Black Belt need to know that a Green Belt doesn’t?

The split is depth, not which tools a Black Belt knows. Both belts learn most of the Six Sigma tools on this page. However, a Black Belt runs the advanced statistical tools independently: multi-factor DOE, advanced regression and ANOVA, and less common hypothesis tests. A Green Belt runs and interprets the basics, with support.

Are Lean tools and Six Sigma tools the same thing?

No, though they’re used together so often that the line blurs in practice. Six Sigma tools mostly reduce variation and defects through data. Lean tools, on the other hand, reduce waste and improve flow, often without statistics. A combined Lean Six Sigma project draws from both. Which one leads depends on whether the problem is variation or flow and waste.

When you’re ready, there are a few ways I can help:

First, join 12,000+ other Six Sigma professionals by subscribing to my email newsletter. A short read every Monday to start your work week off correctly. Always free.

* * *

If you’re looking to pass your Six Sigma Green Belt or Black Belt exams, I’d recommend starting with my affordable study guide:

1)→ 🟢Pass Your Six Sigma Green Belt: a study guide organized by the exam Body of Knowledge, 1,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

2)→ ⚫Pass Your Six Sigma Black Belt: the full Black Belt Body of Knowledge, 2,000+ practice questions with detailed answer explanations, and 15+ full-length mock exams

You’ve spent so much effort learning Lean Six Sigma. Why leave passing your certification exam up to chance? This comprehensive study guide offers 1,000+ exam-like questions for Green Belts (2,000+ for Black Belts) with full answer walkthroughs, access to instructors, detailed study material, and more.

​ Thousands have used this system to prepare. Join them here.